HO 'Steelworks' track
When thoroughly set (it was 24hr epoxy and I left it a few days) I removed the tape and BluTack (not easy!) and used a burr tool in a mini-drill to carve the epoxy down to rail profile. I found the surface of the ties a bit 'damaged' after this exercise. I think the BluTack had attacked the plastic. Next time I'll either use a different dam material, or use 2hr epoxy and get the BluTack off within 12 hours or so. |
18(20)
Copyright Mike Sheridan, 2003
Created with Web Picture Creator 1.50