LS Models
Bridges under construction 3 |
|
Functional styrene bridges - Completed. Through bridge with part of one deck bridge at bottom. The track and guard rails are code 250 brass. Bridge timbers and longitudinal timbers are mahogany. There is a short length of track at the far end of the bridge that brings the guard rails to a point and provides a transition from the rail on the bridges to the code 332 used elsewhere. |
3(8)
Copyright Mike Sheridan, 2003
Created with Web Picture Creator 1.50