Home      Up

Kelpie Canyon Railroad

 

 

Track bed mould 3

Track bed mould 3

Moulds for curved concrete trackbed filled with concrete. When set for about 24 hours the steel pegs are removed with a pair of pliers and cleaned and dried ready for next time. The grease acts as release agent and prevents corrosion. I tried aluminium rods but the concrete seemed to like to stick to them, making them hard to reuse.
These slabs will bridge a couple of foot gap with no problem - the 6 foot radius slabs are 4'6" long and at one end of my layout I had two them of acting as bridges with supports at each end and one place in the middle. I could walk on them (150 pounds).

3(11)

Copyright Mike Sheridan, 2003

Created with Web Picture Creator 1.50