I use a paper template to mark the four holes needed in the baseboard - 3 for wiring & 1 for the operating rod. I make these with a 1/16" or 2mm drill. A turnout is seen ready to lay; the two wires in the middle are those from the previous picture, the one to the left is provided by Peco, but I extend it to reach through my baseboard. At the top is a print of my track plan which is made in 3rd PlanIt. |