HO 'Steelworks' track
This is the first stage of the highline - a 4% grade on a 'concrete' sided ramp. The trackbed is a piece of hardboard cut to shape and supported every 6-8 inches to the correct grade. The underneath volume was then filled with DIY expanding foam from an aerosol. When set this was cut to the shape shown with a sharp knife, and given a skim coat of filler paste. This is the state it is pictured in here. |
1(20)
Copyright Mike Sheridan, 2003
Created with Web Picture Creator 1.50