HO 'Steelworks' structures
The actual ship hoist track rests on the 'pit' built onto the highline. It also rests on the top of the furnace, but is removable to allow the furnace top to be removed (to allow the dust cover to fit). |
29(43)
Copyright Mike Sheridan, 2003-2009
Created with Web Picture Creator 1.8