AHTS Upperworks Build
The ceiling was then fitted to the stacks and its location checked for the correct 10mm overhang being even all round with a ruller and square. It was then glued in place. |
17(33)
Copyright Mike Sheridan, 2012-2013
Created with Web Picture Creator 1.8