Home      Up

AHTS Upperworks Build

 

 

Bridge 3

Bridge 3

The ceiling was then fitted to the stacks and its location checked for the correct 10mm overhang being even all round with a ruller and square. It was then glued in place.

17(33)

Copyright Mike Sheridan, 2012-2013

Created with Web Picture Creator 1.8